Utility Connection

Two things that need to happen before the system can produce electricity. First, Titan will submit the documents to the utility company to connect to the grid. This usually takes 1 to 2 weeks. Second, the utility company has to install net metering to track how much energy is producing. Titan will have little control over how long this step is going to take!